• Long Rod Ball Float Level Controller Part
  • Long Rod Ball Float Level Controller Part
  • Long Rod Ball Float Level Controller Part
  • Long Rod Ball Float Level Controller Part
  • Long Rod Ball Float Level Controller Part

Long Rod Ball Float Level Controller Part

Stainless Steelball Float: Stainless Steel Ball Floating
Delivery: 7-30 Days
Sample: Can Provide
Polishing: Polishing
Transport Package: Box
Specification: depend on the drawing
Samples:
US$ 1/Piece 1 Piece(Min.Order)
| Request Sample
Diamond Member Since 2016

Suppliers with verified business licenses

Manufacturer/Factory

Basic Info.

Model NO.
Customized Float
Trademark
sanlo
Origin
China
HS Code
9032900090
Production Capacity
10000

Product Description

Long Rod Ball Float Level Controller Part
Long Rod Ball Float Level Controller Part
   We production float ball for more than 18 years , we do magnetic float ball /level switch float ball / traps float ball and other customer made one . we have more than 80 kinds of float ball for customer to chose it. To suitable the different customers.
   Our float ball have three testing project before send to customer. There is :1.100degree hot water testing 2. Higher pressure to testing pressure for more than 8 hours . 3. The Helium mass spectrometer detection equipment for final testing . then send out . To make sure 100% no leakage from float ball .
   For the normal size , we have big stock for it , so can be delivery within 2-3days. And for the customer made one normal is 25-30days can be offer the sample to customer for confirm it. After confirm will start final production .

   So welcome to order float ball from Sanlo. We will promise the best quality for you .


Name
 
Long Rod Ball Float Level Controller Part

Model
 
Long Rod Float

Size
 
Customized

Application
 
Magnetic liquid level control switch

Material
 
304 / 316L
Certificate ** ISO9001
** CQC
** SGS
** CNAS

Long Rod Ball Float Level Controller Part
Long Rod Ball Float Level Controller Part
Long Rod Ball Float Level Controller Part
Long Rod Ball Float Level Controller Part
 

----- FAQ

Q:If 'I' want small quantity and fast delivery. Which way of shipping is advised ?

A:By express.

Q:What's the lead time ?
A: If in stocks,2days;or ,it will take 7-15days,depend on the quantity.

Q:.How long would feedback be?
A: As soon as we can,usualy reply you in 24 hours.

Q: What is the common price of your rare earth magnet?
A: According to cost of raw materials and manufacturering process,we constantly offer quality magnets with reasonable price.

 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Diamond Member Since 2016

Suppliers with verified business licenses

Manufacturer/Factory
Management System Certification
ISO 9001, ISO 9000